Battery containers & blocks
SKTESS5000 5 MWh containers and SKTESS10000-5000K 10 MWh / 5 MW integrated blocks with BMS and fire safety.
Solution
Utility-scale battery energy storage from 5 MWh containers to 80 MW / 160 MWh plants for arbitrage, grid services and standalone BESS.
The challenge
Volatile wholesale prices and rising renewable penetration make standalone, utility-scale BESS a core grid asset — but only if it is bankable, safe and delivered on time.
How it works
Standardized containers and integrated blocks combine into AC blocks and full plants, all under one EMS.
The SKTESS5000 LFP container (314 Ah cells, liquid-cooled) is the standard energy building block.
The SKTESS10000-5000K pairs 10 MWh with a 5 MW central PCS as a pre-integrated AC block.
SKTESS2500K / 5000K / 10000K prefabricated inverter substations add PCS plus medium-voltage step-up in one skid.
Blocks scale to 20 MWh AC blocks and 80 MW / 160 MWh plants, coordinated by a plant-level EMS, with optional grid-forming control.
Outcomes
Product specifications are SAKETE SmartStore / Container series values. Project outcomes such as payback, self-consumption and demand-charge reduction depend on your site load profile, tariff and system sizing, and are confirmed in the project quote.
SAKETE scope
SKTESS5000 5 MWh containers and SKTESS10000-5000K 10 MWh / 5 MW integrated blocks with BMS and fire safety.
Prefabricated inverter substations (SKTESS2500K / 5000K / 10000K class) with central PCS and medium-voltage step-up.
Plant-level EMS, SLD and layout design, grid-code compliance (EN 50549 / VDE-AR-N 4105 / G99 / IEC 62116), commissioning and after-sales.
Project references
Representative SAKETE storage projects in this application.
Standalone BESS · 11% of the RESTORE programme
Portfolio including Pleven 600 MWh & 200 MWh, Stara Zagora 200 MWh, Kameno 50 MWh, Silistra 40 MWh and Balchik 20 MWh — delivering grid stability and flexibility for the EU energy transition.
Containerised · 5 MW central PCS
Storage added to a 10 MWp PV plant — charge at low prices, discharge to sell at peak prices.
Containerised · 2.5 MW central PCS
Storage added to a 10 MWp PV plant for price arbitrage on an existing grid connection.
FAQ
Plants are modular: a single 5 MWh container scales through 10 MWh / 5 MW blocks and 20 MWh AC blocks up to 80 MW / 160 MWh and beyond, all under one plant EMS.
Yes. Utility-scale delivery is turnkey: central PCS and medium-voltage step-up are provided as prefabricated inverter substations (SKTESS2500K / 5000K / 10000K class).
Yes. SAKETE was awarded 1.1 GWh of standalone BESS in Bulgaria’s Next Generation EU RESTORE programme, alongside containerized 5 MW / 10 MWh deployments in Europe.
Grid-forming control is available as an option. PCS options are grid-code compliant for European connection (EN 50549, VDE-AR-N 4105, G99, IEC 62116 anti-islanding), confirmed per project and country.
Share your site profile and SAKETE returns a tailored quote from European stock — typically within 1–2 business days.