C&I battery system
Air- and liquid-cooled systems from 50 kW cabinets to MW-class containers, sized to your peak.
Solution
Battery systems discharge during demand peaks to reduce grid demand charges for factories and commercial sites.
The challenge
On commercial tariffs, a few minutes of peak demand can set the demand charge for the whole month.
How it works
The battery discharges precisely during demand peaks and recharges off-peak.
The EMS/HEMS continuously measures site demand against your target threshold.
When demand approaches the limit, the PCS begins discharging in milliseconds (≤20 ms response).
The PCS supplies the peak — with 1.5 Pn / 10 s overload headroom — so grid draw stays below the threshold.
The battery recharges from the grid or PV during low-tariff periods.
Outcomes
Product specifications are SAKETE SmartStore / Container series values. Project outcomes such as payback, self-consumption and demand-charge reduction depend on your site load profile, tariff and system sizing, and are confirmed in the project quote.
SAKETE scope
Air- and liquid-cooled systems from 50 kW cabinets to MW-class containers, sized to your peak.
SOLINTEG, ENJOY or MEGAREVO PCS, plus central PCS up to 99% efficiency for fast peak response.
Threshold setup, monitoring and tuning to your tariff structure.
Project references
Representative SAKETE storage projects in this application.
Standalone BESS · 11% of the RESTORE programme
Portfolio including Pleven 600 MWh & 200 MWh, Stara Zagora 200 MWh, Kameno 50 MWh, Silistra 40 MWh and Balchik 20 MWh — delivering grid stability and flexibility for the EU energy transition.
FAQ
Savings depend on your tariff and load profile. Sites with sharp, predictable peaks typically cut demand charges most. We model your case from interval meter data before quoting.
No. Peak shaving works with a grid-charged battery alone, and can be combined with PV for additional savings.
It depends on your demand-charge rate, peak profile and any price-arbitrage spread. Comparable European arbitrage retrofits have reached roughly 1-year payback; we run a site-specific ROI calculation from your tariff and interval data before quoting.
Yes. SAKETE was awarded 1.1 GWh of standalone BESS in Bulgaria’s Next Generation EU RESTORE programme, alongside C&I-scale cabinet and container systems.
Share your site profile and SAKETE returns a tailored quote from European stock — typically within 1–2 business days.